- Still moving. L disassembled the barn loom yesterday and we moved it -- all but the warp/back beam are currently in our little barn for now. Living room and two bedrooms are cleared. Kitchen is nearly done, bathroom is half done, pantry is about 2/3 done. Office is maybe 1/3 done. Still have things to move at least from the attic to the back attic, but the back attic has been mostly cleared, so there's definitely room to do that.
- Internet guy comes to the house tomorrow (Tuesday).
- Yesterday we started the process of closing in the front porch, with the hopes of turning it into a temporary greenhouse. Challenging working with that large a piece of plastic!
- We also celebrated our 18th wedding anniversary by going to see The Hobbit (2D). A few liberties taken, but overall we enjoyed it.
- The shower curtain ring project has begun. The old system was 3/4 plus a straight rod on the wall. The 3/4 section was suspended on only two rods and the pieces were press-fit. The new one will be significantly better.
- Internet guy comes to the house tomorrow (Tuesday).
- Yesterday we started the process of closing in the front porch, with the hopes of turning it into a temporary greenhouse. Challenging working with that large a piece of plastic!
- We also celebrated our 18th wedding anniversary by going to see The Hobbit (2D). A few liberties taken, but overall we enjoyed it.
- The shower curtain ring project has begun. The old system was 3/4 plus a straight rod on the wall. The 3/4 section was suspended on only two rods and the pieces were press-fit. The new one will be significantly better.